Test Procedures
Test Procedures Reports and Information
- Updated Review of Potential Test Procedures for FMVSS No. 208
- NCAP Test Improvements with Pretensioners and Load Limiters DOT HS 809 562 NHTSA Technical Report
- An Evaluation of Side Structure Improvements in Response to Federal Motor Vehicle Safety Standard 214 NHTSA Report Number DOT HS 806 314
Test Procedures
Number
|
Details | Files |
|---|---|---|
| 219 |
Windshield Zone Intrusion standard regulation (*212/219/301F/301R)
Standard regulation on windshield zone intrusion (*212/219/301F/301R). Completed TP-301-04 Engineer: Lawrence Valvo |
|
| 220 |
School Bus Rollover Protection
Standard regulation on school bus rollover protection. Completed TP-220-02 Engineer: Ed Chan |
|
| 221 |
School Bus Body Joint Strength
Standard regulation on school bus body joint strength. Completed TP-221-03 Engineer: Ed Chan |
|
| 222 |
School Bus Passenger Seating -- Crash Protection
Standard regulation on school bus passenger seating -- crash protection. Completed TP-222-05 Engineer: Ed Chan |
|
| 223 |
Rear Impact Guards (Effective 1/26/98)
Standard regulation on rear impact guards (effective 1/26/98). Completed TP-223-00 Engineer: Luis Figueroa |
|
| 224 |
Rear Impact Protection (Effective 1/26/98)
Standard regulation on rear impact protection (effective 1/26/98). Completed Visual Inspection Engineer: Luis Figueroa |
|
| 225 |
Child Seat Anchorages
Standard regulation on child seat anchorages. Completed TP-225-01 Engineer: Ed Chan |
|
| 226 |
Ejection Mitigation
Standard regulation on ejection mitigation Completed TP-226-00 Engineer: Karen Nuschler |
|
| 301F |
Fuel System Integrity - Frontal Fixed Barrier Impacts
Standard regulation on fuel system integrity - frontal fixed barrier impacts. Completed TP-301-04 Engineer: Ed Chan |
|
| 301L |
Fuel System Integrity - Lateral Moving Barrier Impacts
Standard regulation on fuel system integrity -- lateral moving barrier impacts. Completed TP-301-04 Engineer: Ed Chan |
|
| 301R |
Fuel System Integrity - Rear Moving Barrier Impacts
Standard regulation on fuel system integrity -- rear moving barrier impacts. Completed TP-301R-02 Engineer: Ed Chan |
|
| 301SB |
Fuel System Integrity - School Bus Moving Barrier Impacts
Standard regulation on fuel system integrity -- school bus moving barrier impacts. Completed TP-301S-02 Engineer: Mike Rossey |
|
| 302 |
Flammability of Interior Materials
Standard regulation on the flammability of interior materials. Completed TP-302-03 Engineer: Mike Cole |
|
| 303 |
Fuel System Integrity of Compressed Natural Gas (CNG) Vehicles
Standard regulation on fuel system integrity of Compressed Natural Gas (CNG) vehicles. Completed TP-303-00 Engineer: Ed Chan |
|
| 303SB |
Fuel System Integrity -- CNG Fueled School Buses
Standard regulation on fuel system integrity -- CNG-fueled school buses. Completed TP-303-SB-00 Engineer: Ed Chan |
|
| 304 |
CNG Fuel Container Integrity
Standard regulation on CNG fuel container integrity. Completed TP304-03 Engineer: Luis Figueroa |
|
| 305 |
Electric Vehicles
Standard regulation on electric vehicles. Completed TP305-01 Engineer: Ed Chan |
|
| 401 |
Interior Trunk Release
Standard regulation on interior trunk release. Completed TP-401-01 Engineer: Andre Jones |
|
| 403 |
Platform Lift Systems
Standard regulation on platform lift systems for motor vehicles Completed TP 403-01 Engineer: Vince Williams |
|
| 404 |
Platform Lift Installations in Motor Vehicles
Standard regulation on platform lift systems for motor vehicles Completed TP 404-00 Engineer: Vince Williams |
|
| < Previous Page 4 of 5 Next > | ||
RSS this page

